Products

Jack-up barge design & operations

Design, conversion and operational support for jack-up barges and self-elevating platforms.

  • PROJECT

We combine structural, mechanical, control-system and marine engineering with years of operational and geotechnical experience. We work on small modular units for nearshore geotechnical drilling, mid-size barges converted for marine construction and large offshore jack-up vessels on major infrastructure. The scope can be a new build, a system upgrade or a site-specific plan.

Barge & platform design and conversion

We design complete jack-up rigs and conversion systems, from reinforcing hulls and pontoons to integrating hydraulic jacking systems and achieving marine-class approval (DNV, Bureau Veritas). This includes modular self-elevating platforms built from standardised, road-transportable floating modules pin-connected together.

Leg design & structural load cases

We define and analyse the leg structural load cases that size a jacking system - operational, preload, leg-extraction and accidental - working to recognised standards (DNV, Bureau Veritas, ISO 19905, Noble Denton guidelines for elevated operations). We deliver spudcan bearing-capacity and seabed leg-penetration analysis to these standards.

Preloading methodology

We derive and apply the leg-preload case as the governing design condition - the deliberate over-load that proves each foundation before elevating - and configure the jacking system to hold and read out preload. It ties the structural design to the safe-to-elevate decision.

Site risk assessments for jack-up operations

The safe-to-jack window is site-specific. Short-period wind chop behaves very differently from long-period ground swell: with several wave peaks along the hull the heave largely cancels and jacking is possible in larger waves, while a single long-period peak causes a seesawing pitch that amplifies leg loading on landing. We assess wave period and conditions against the system’s limits, quantify how a faster jacking system reduces time in the higher-risk semi-floating phase and support the barge master and jacking engineer with the site-specific risk assessment, working to DNV (including the Noble Denton marine-operations guidelines), ISO 19905 and RenewableUK jack-up guidance.

Operational consultancy

We support barge masters, contractors and asset owners with method statements, mobilisation planning, preload procedures, on-site inspection, hydraulic condition assessments, hose registers, maintenance plans and equipment-upgrade recommendations.