Jack-up barge solutions

Jack-up barge retrofit, upgrades & automation

Jacking upgrades, automation and equipment modifications for existing jack-up barges.

For barges with short-stroke or manually-valved jacking, dated control or equipment that no longer meets the duty or the standards. The work runs from audit through to upgrade and re-certification on the existing asset.

Upgrade scope

  • Jacking upgrades - central and automated control, regenerative speed-up, shock-absorption and preload control. See jacking systems.
  • Automation & control - interlocked control of jacking and deck systems, with remote and automated operation. See remote control systems and power, control & automation.
  • Equipment modifications - deck, access and mission-equipment changes. See equipment modifications.
  • Structural & design assurance - structural appraisal, analysis and re-certification to marine and structural standards. See design verification.